Saturday, July 6, 2019

BABY QUILT MARATHON - DAY 5


Baby Quilt #2 top completed

Day 5
I spent a total of 3 hours and 10 minutes to get this top completed.  This one really felt like a marathon.  All I had to do was sew the triangles with the 4-patches.  It felt like a true marathon.  Just one more triangle, just one more triangle, but one at a time I finally got them done.  Then I just needed to put the rows together.  Only 7 seams. How long could that take?  Not too long but it seemed like forever, but finally, I have another top ready to quilt.  Now I need to get that king size quilt finished so I can quilt these two tops!

Thanks for stopping by.  Please see previous posts for information on this Baby Quilt Marathon.

1 comment:

  1. The quilt turned out so nice with you putting the scrappy 4 patches in between the rows like that. Good job.

    ReplyDelete